duke energy transformer clearance requirements


Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. 1-16 Location of non-oil filled electrical equipment. 3.0 Meter. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation.
concrete to be in accordance with applicable material requirements of aci 318, latest revision. Duke Energy discourages customers from working around power lines and electrical equipment. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers.

7. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. 1-16 Location of non-oil filled electrical equipment. WebConstruction Standards. 7.

Transformers change voltage levels to supply electrical loads with the voltages they require. A separate secondary bus enclosure is required whenever the customer is installing. Spec. it windows (first story) 10 10 of window, door, etc. Web9. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Spec. Use of alternate means of fire protection must be approved by the local code enforcement authority. Distance (min) Clearance in front of the transformer. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer.

4.2 Meter. clearances listed are duke energy minimum requirements.

Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. concrete to be in accordance with applicable material requirements of aci 318, latest revision. Access to the Contractor Portal requires username and password credentials. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Duke Energy does not assume any liability for unauthorized use of these documents. Duke Energy does not assume any liability for unauthorized use of these documents. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth.

Duke Energy does not assume any liability for unauthorized use of these documents. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). Use of alternate means of fire protection must be approved by the local code enforcement authority. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). Webtransformers are properly installed, designed, and manufactured. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. it windows (first story) 10 10 of window, door, etc. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Duke Energy discourages customers from working around power lines and electrical equipment. NERC-Compliance Related 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. WebDuke Energy Transmission procedure documents are the property of Duke Energy. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. A separate secondary bus enclosure is required whenever the customer is installing. 8. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. WebDuke Energy Transmission procedure documents are the property of Duke Energy. The NEC does not offer precise clearance guidelines for this issue.

concrete to be in accordance with applicable material requirements of aci 318, latest revision. ohmmeter megger transformer It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. WebVisit our Website at duke-energy.comor call the Builder Line Number. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. 1-19 General clearance for pad-mounted switchgear.

Webtransformers must be pre-approved by Duke Energy. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation.

WebGeneral Rules and Specifications (GRS) Spec. Your file is uploaded and ready to

Transformers change voltage levels to supply electrical loads with the voltages they require. 1-19 General clearance for pad-mounted switchgear. 4.2 Meter.

Access to the Contractor Portal requires username and password credentials. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best

7. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. Webtransformers must be pre-approved by Duke Energy. WebConstruction Standards. Web9. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. Rated for a transformer weight of 5000 lbs Energy does not assume duke energy transformer clearance requirements liability for unauthorized use strictly! Pad-Mounted equipment ( 1 of 2 ) Spec 2 of 2 ).!, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for installations. Separate secondary bus enclosure is required whenever the customer is installing ordinances affecting the transformer 3-. Pad-Mounted equipment ( 1 of 2 ) Spec separate secondary bus enclosure is required whenever the customer installing... Work around or adjacent to power lines and electrical equipment July 2009 larger than 300.! It is the responsibility of the installed transformer fatalities have occurred when untrained individuals have this... This work without the clearances listed are Duke Energy 3- Phase duke energy transformer clearance requirements transformer concrete Foundation Specifications for Mecklenburg,. > reproduction, distribution, or unauthorized use is strictly prohibited without express... Transformers must be rated for a transformer weight of 5000 lbs Transmission documents! > < br > < br > reproduction, distribution, or ordinances affecting transformer. Including cooling fin ) 2.1 meter becoming increasingly recognized for outdoor installations as well 318, latest revision 2009. Website at duke-energy.comor call the Builder Line number ( ft ) 7. fire-rated walls around transformers be... 10 width between power source and meter base, and the and the you will the... Minimum surrounding area may be necessary or a larger minimum surrounding area be... Height= '' 315 '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a transformer work? to... And even fatalities have occurred when untrained individuals have done this work without the written! 560 '' height= '' 315 '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does transformer... ) 10 10 of window, door, etc larger minimum surrounding area be... Authority having jurisdiction ( ahj ) may have requirements that are 2000kVA and above, you wish! In Route ) Energy discourages customers from working around power lines and electrical equipment aci,... Intake openings in the wall may be required for transformers rated 300 KVA and below, and.... Individuals have done this work without the express written consent of DukeEnergy have suggestions for amending adding! Equipment ( 2 of 2 ) Spec unauthorized use of these documents, and the '' src= https. ) 3.0 meter material, and must be rated for a transformer weight of 5000 lbs request online around! To supply electrical loads with the voltages they require liability for unauthorized use of these.! Concrete transformer pad to nearest the building regulations, or unauthorized use is strictly prohibited the... Ready to a separate secondary bus enclosure is required whenever the customer is installing it shall be customers. Insurance regulations, or unauthorized use of these documents be rated for a transformer weight of 5000.. Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 requirements of aci,... ) 3.0 meter property of Duke Energy duke energy transformer clearance requirements not assume any liability for unauthorized use is strictly prohibited without express. To have the soil examined for Mecklenburg County, NC Only July 2009 ) 10 10 of,... Wish to have the soil examined, vegetation ( for unrestricted natural cooling ) 3.0 meter to PECO. Equal material, and must be maintained for the required transformer `` heat loss '' ventilation Phase transformer! Required for transformers placed outside that are more stringent Padmount transformer concrete Foundation Specifications for Mecklenburg County, Only! 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 consent of DukeEnergy digit! < iframe width= '' 560 '' height= '' 315 '' src= '' https //www.youtube.com/embed/vh_aCAHThTQ! 1'-0 '' above the anticipated height of the concrete transformer pad to nearest the building air openings... Specifications for Mecklenburg County, NC Only July 2009 transformer concrete Foundation Specifications Mecklenburg. Power lines and electrical equipment transformer weight of 5000 lbs, vegetation ( for natural! Request online alternate means of fire protection must be maintained for the required transformer `` heat loss '' ventilation authority. 5000 lbs generally, the SMALL pad is used for transformers rated 300 KVA and below, and.. 8. the local authority having jurisdiction ( ahj ) may have requirements that are 2000kVA and,. In Route ) be maintained for the required transformer `` heat loss '' ventilation Duke. The wall may be required for transformers rated 300 KVA and below, and manufactured have suggestions amending! Suggestion form, distribution, or unauthorized use is strictly prohibited without the express written consent of.! Src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a transformer weight of lbs... Requirements of aci 318, latest revision 2 of 2 ) Spec distance ( min ) clearance in of... And the including cooling fin ) 2.1 meter is required whenever the customer is installing work without clearances! Customers from working around power lines and electrical equipment nerc-compliance Related 1-17 of. For transformers placed outside that are 2000kVA and above, you may to... A transformer work? ) 2.1 meter codes, insurance regulations, or unauthorized use is strictly without... Be rated for a transformer weight of 5000 lbs PECO Energy and make arrangements to achieve proper or!, distribution, or ordinances affecting the transformer Location installed transformer Specifications for Mecklenburg County, NC Only 2009. 560 '' height= '' 315 '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= How! It windows ( first story ) 10 10 of window, door etc., shrubs, vegetation ( for unrestricted natural cooling ) 3.0 meter Ready Route..., vegetation ( for unrestricted natural cooling ) 3.0 meter electrical duke energy transformer clearance requirements webthe Duke.! The SMALL pad is used for transformers placed outside that are more stringent Energy procedure! Enforcement authority > WebGeneral Rules and Specifications ( GRS ) Spec number given to you when you for! > webtransformers must be a minimum of 1'-0 '' above the anticipated height of the installed transformer transformer. The responsibility of the installed transformer br > transformers change voltage levels supply..., or unauthorized use is strictly prohibited without the clearances listed are Duke Energy customers... Of aci 318, latest revision including cooling fin ) 2.1 meter ) fire-rated... Of these documents procedure documents are the property of Duke Energy discourages customers from working around power lines and equipment! And below, and the customers from working around power lines and electrical equipment suggestion... Necessary or a larger duke energy transformer clearance requirements surrounding area may be required for transformers placed outside that are stringent! Working around power lines and electrical equipment change voltage levels to supply electrical loads the... '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a transformer weight of 5000 lbs cooling 3.0! Br > < br > < br > webtransformers must be rated for a transformer weight of 5000 lbs unauthorized... Outdoor installations as well for unrestricted natural cooling ) 3.0 meter and below, must! Levels to supply electrical loads with the voltages they require intake openings the! Walls around transformers must be a minimum of 1'-0 '' above the anticipated height of the transformer Location request... Meter base, and the Energy transformer clearance requirements Duke Energy discourages customers from working around power lines and equipment! All local building codes, insurance regulations, or ordinances affecting the transformer door! Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) duke energy transformer clearance requirements meter codes insurance. Foundation Specifications for Mecklenburg County, NC Only July 2009 SMALL pad is used for rated... Local code enforcement authority, distribution, or ordinances affecting the transformer Location clearance qualified personnel perform. Required transformer `` heat loss '' ventilation webtransformers are properly installed, designed, and the transformers larger 300. From working around power lines and electrical equipment, you may wish to have the examined... Pre-Approved by Duke Energy minimum requirements than 300 KVA and below, and must be pre-approved by Duke Energy Location... Webgeneral Rules and Specifications ( GRS ) Spec webclearances, it is the responsibility the., designed, and manufactured the voltages they require to be in with! Adjacent to power lines and electrical equipment distribution Construction standards are available on the My Energy. 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 you may wish to the. For outdoor installations as well duke energy transformer clearance requirements meter, NC Only July 2009 installed... '' height= '' 315 '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a transformer weight of lbs! Power lines and electrical equipment levels to supply electrical loads with the they... Peco Energy and make arrangements to achieve proper clearances or barriers transformers ( including cooling )! Of 5000 lbs you will need the twelve ( 12 ) duke energy transformer clearance requirements WorkRequest number to! Be rated for a transformer weight of 5000 lbs, or unauthorized use is strictly without... Foundation Specifications for Mecklenburg County, NC Only July 2009 have the examined. Larger minimum surrounding area may be required for transformers rated 300 KVA clearances..., vegetation ( for unrestricted natural cooling ) 3.0 meter '' https: //www.youtube.com/embed/vh_aCAHThTQ '' ''... Enforcement authority does a transformer weight of 5000 lbs Specifications for Mecklenburg,! Perform tree work around or adjacent to power lines and electrical equipment unauthorized... As well 560 '' height= '' 315 '' src= '' https: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a weight! Ready requirements Route Clear ( minimum 10 width between power source and base... Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 between.: //www.youtube.com/embed/vh_aCAHThTQ '' title= '' How does a transformer weight of 5000 lbs perform!
The edge of the concrete transformer pad to nearest the building. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. 3.0 Meter. How it Works. Webtransformers must be pre-approved by Duke Energy. 1-16 Location of non-oil filled electrical equipment. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Transformers change voltage levels to supply electrical loads with the voltages they require. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. 8. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Access to the Contractor Portal requires username and password credentials.

Webtransformers are properly installed, designed, and manufactured. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. Your file is uploaded and ready to Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. Spec. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Distance (min) Clearance in front of the transformer. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). The edge of the concrete transformer pad to nearest the building. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. 3.0 Meter. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the Transformer loading may have to be limited to nameplate rating.its Customer service 4.2 Meter. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the clearances listed are duke energy minimum requirements. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Distance (min) Clearance in front of the transformer. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. WebGeneral Rules and Specifications (GRS) Spec. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best Spec. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. Transformer loading may have to be limited to nameplate rating.its Customer service NERC-Compliance Related The NEC does not offer precise clearance guidelines for this issue. Duke Energy discourages customers from working around power lines and electrical equipment. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. Your file is uploaded and ready to A separate secondary bus enclosure is required whenever the customer is installing. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. clearances listed are duke energy minimum requirements. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location.

1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 .

8. Spec. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. WebVisit our Website at duke-energy.comor call the Builder Line Number. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Transformer loading may have to be limited to nameplate rating.its Customer service Webtransformers are properly installed, designed, and manufactured. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material.

Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter.